Back to Top

DEENDAYAL UPADHYAYA GRAM JYOTI YOJANA (DDUGJY)

Background

Govt. of India, vide Office Memorandum F.No.44/44/2014-RE dated 3rd December 2014 issued by the Ministry of Power, launched Deendayal Upadhyaya Gram Yyoti Yojana (DDUGJY) with the following components

    (i) Separation of agriculture and non-agriculture feeders for supply to agricultural & non-agricultural consumers in the rural         areas for effective demand side management.

    (ii) Strengthening and augmentation of sub-transmission & distribution (ST&D) infrastructure in rural areas, including          metering at distribution transformers, feeders and consumer end.

    (iii) Rural electrification, as per CCEA approval dated 01.08.2013 for completion of the targets laid down under RGGVY for 12th           and 13th plans.

Board Objective of the Scheme

     Providing access to power for all households.

     24X7 Power for All by 2019

     AT&C loss reduction as per trajectory finalized by MoP.

Scope of Works specific to achivements of the broad objectives:

Access to Power for all households :

Electrifiction of un electrified(UE) villages and creation of new village infrastructures for access to power for all house holds


24X7 power supply for non-Agri-consumer and adequate supply for Agri-consumer :

Physical seperation of HT feeders for Agricultural and non-Agricultural consumers.


AT&C loss reduction :

Strengthening of sub-transmission & distribution sysytem and metering at all levels of distribution network.


Sailent Features of the Scheme :

Nodal Agency :    Rural Electrification Corporaion Limited(REC) is the Nodal Agency operationalisation and implementation of the scheme under the overall guidance of MoP.

Project Management Agency (PMA) :    REC Power Distribution Company Ltd(RECPDCL)and PFC Consulting Ltd(PFCCL) have been appointed as Project Management Agency(PMA)to assist in project management as well as timely implementation of the project.

Mode of Implementation :    The projects shall be implemented on turn-key basis.However some work will be executed on partial turnkey/departmental basis for which approval has been received from the Monitoring Commitee,MoP,GOI.

Implementation Period :    Projects under the scheme shall be completed within a period of 24 months from the date of issue of Letter of Award (LoA). For execution of work on partial turnkey/departmental basis, project needs to be completed within 30 months from date of communication of the approval of the Monitoring committee.

Funding pattern of the Scheme :


Agency Nature of Support Quantum of support
(Percentage of Project Cost)
Govt.of India Grant 60%
State Contribution Grant 25%
WBSEDCL own Contribution/Loan Own
contribution/Loan
15%


Approval of the Project by Nodal Agency:
The component wise cost as per district wise submitted DPRs were approved in the 6th Monitoring commitee held on 10/12/2015 and comminucated by the Nodal Agency The REC Ltd.vide memo no:REC/ZO/KOL/DDUGJY/2015-16/834 Dated 01/02/2016

Component wise Sanctioned cost :


Sl.No Items Cost
(Rs in Crore)
1 Electrification of Un electrified villages. 46.86
2 Sansad Adarsh Gram Yojana (SAGY) 0.60
3 Metering 441.22
4 Feeder Separation 1159.96
5 Access to rural Households 1729.93
6 System Strengthening 862.34
  Total Project Cost: 4240.90
7 PMA Charges @0.5% of total project cost 21.20
  Total Sanctioned project cost 4262.10
8 PMA Charges @1% of total Project cost (Borne by WBSEDCL) 42.40
  Total Project Cost : 4304.50


DPR wise sanctioned cost Under the Project

SlNo. Name of District Elect of UE Villages SAGY Metering Access to rural HH System Strength enling Feeder Separation Total Financial Involvement
(Rs.in Crores)
1 Bankura Nil Nil 19.99 102.03 35.77 68.12 225.91
2 Bardhaman Nil Nil 28.47 141.43 75.17 145.63 390.7
3 Birbhum Nil Nil 26.55 96.31 46.58 117.45 286.89
4 Dakshin
Dinajpur
Nil Nil 14.07 58.27 33.53 34.88 140.75
5 Darjeeling Nil 0.6 8.72 47.63 45.23 9.82 112
6 Howrah Nil Nil 24.65 46.3 45.41 5.24 121.6
7 Hoghly Nil Nil 20.52 148.43 24.89 72.9 266.74
8 Jalpaiguri Nil Nil 9.99 55.1 53.71 16.28 135.08
9 Coochbehar Nil Nil 11.62 41.85 45.75 3.72 102.94
10 Malda Nil Nil 36.51 50.72 81.44 92.37 261.04
11 Mursidabad Nil Nil 26.19 103.84 46.12 117.9 294.05
12 Nadia Nil Nil 24.57 105.47 49.81 88.2 268.05
13 North 24
Parganas
Nil Nil 39.01 152.11 46.82 67.65 305.58
14 North 24
Parganas(Bidhannagar)
Nil Nil 6.03 11.89 2.3 4.15 24.36
15 Paschim
Midnapore
Nil Nil 44.77 175.71 62.47 180.99 463.94
16 Purba
Midnapore
Nil Nil 37.14 99.01 58.12 55.51 249.78
17 Purulia Nil Nil 15.08 67.39 15.05 7 104.51
18 South 24
Parganas
46.86 Nil 33.18 170.26 50.71 43.51 344.51
19 Uttar
Dinajpur
Nil Nil 14.16 56.19 43.47 28.66 142.47
  Total 46.86 0.6 441.22 1729.93 862.34 1159.96 4240.90


DETAIL SCOPE OF WORK UNDER DEENDAYAL UPADHYAYA GRAM JYOTI YOJANA (DDUGJY)


Sl No DETAIL SCOPE OF WORK UNIT QUANTITY FInancial Involvement
(Rs in lakhs)
I ELECTRIFICATION OF UE VILLAGES
(14 no villages in Gosaba,Namkhana & Patharpratima Block under south 24 Pargana District)
     
a) Installation of new DTR No 294 605
b) Drawal of new 11KV Spur Line DTR KM 165 623
c) Drawal of new LT AB Cable KM 530 3,254
d) Connection to BPL House Holds No 6,790 204
  SUB TOTAL(I):     4685.66
II FEEDER SEPARATION :
(Physical Separation of HT Feeders for Agricultural & Non Agricultural Consumers)
     
a) New 11KV Bay NO 625 4,508
b) New 11KV Line (621 no feeder) KM 17,579 78,869
c) Installation of new DTR NO 14,287 32,619
  SUB TOTAL(II):     115,996
III ACCESS TO RURAL HOUSEHOLDS
(for connecting unconnected households)
     
a) Capacity Augmentation of existing DTR No 2,160 4,337
b) Conversion of existing LT O.H. Line to AB Cable KM 19,737 87,985
c) Installation of new DTR NO 10,560 28,817
d) New 11KV Spur Line KM 5,170 15,609
e) New LT AB Cable line KM 2,320 14,347
f) New LT O.H Line KM 5,660 21,162
g) Connection of BPL HHs NO 24,515 735
  SUB TOTAL(III):     172,993
(IV) METERING      
a) Installation of Dist Transformer metering NO 122,597 19,475
b) Installation of FEEDER Metering NO 512 77
c) Replacement of defective /electro magnetic(old)consumer Metering NO 1,366,391 16,631
d) Shifting of existing consumer metering NO 396,949 7,939
  SUB TOTAL(IV):     44,122
(V) SANSAD ADARSH GRAM YAJONA      
a) Installation of new 11 KV Bay NO 1 7
b) Drawal of new 11KV Line KM 10 52
  SUB TOTAL(V):     60
(VI) SYSTEM STRENGTHENING      
a) Drawal of new New 33KV Line KM 1,969 11,633
b) Augmentation of existing 33 KV Line KM 82 379
c) Construction of New 33/11KV Sub Station NO 80 38,945
d) Augmentation of existing 33/11KV Sub Stations NO 106 10,953
e) Drawal of New 11KV Line KM 2,781 12,619
f) Augmentation/Renovation of existing 11KV Line KM 2,365 6,008
g) Installation of new 33KV Bay NO 77 5,698
  SUB TOTAL(VI):     86,234
   GRAND TOTAL:     424,091




UP-TO-DATE STATUS OF DDUGJY SCHEME AS ON 30.09.2018

A . Status of Work Village Infrastructure for access to power for all Rural Household ,Feeder
Separation and Metering work in Turnkey Mode

SL NO: District Item of Work Status of Award/Tender Name of Awarded Turnkey Agencies Staus of work Target for completion
   1   North 24 parganas Feeder Segregation LOA Issued M/S L&T Ltd Work stated in 16 no. Feeders. May 2019
Metering 156603 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 1370 km renovation of LT line by AB Cable completed.
125 no. New Distribution Transformer installed.
   2    South 24 parganas and Biddhannagar Feeder Segregation LOA issued M/S IL&FS ECC Ltd Work stated in 8 no. Feeder. 2 no commissioned. January 2019
Metering 100263 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. LOA issued M/S IL&FS ECC Ltd 748 km renovation of LT line by AB Cable completed
73 no new distribution Transformer installed.
Electrification of 14 UE & 59 PE villages in Sundarban area. M/S Sterling & Wilson Ltd Work Completed
   3   Howrah Feeder Segregation LOA Issued M/S EMC Ltd LOA placed with the agency terminated due to non perforance. Fresh tender under process.
Metering LOA Issued
Village Infrastructure for access to power for all Rural HH. LOA Issued
   4   Burdwan Feeder Segregation LOA issued M/S Lumino Ind. Ltd Work started in 81 no. Feeders.
32 no commissioned.
January 2019
Metering LOA issued M/S NCC Ltd 86438 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. LOA issued 1065 km renovation of LT line by AB Cable completed.
LOA issued 408 no New Distribution Transformer instaklled.
   5   Hooghly Feeder Segregation LOA issued M/S L&T Ltd Work started in 22 no. Feeders.4 no commissioned. January 2019
Metering 68416 no defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 1240 km renovation of LT line by AB Cable completed.
138 no New Distribution Transformer installed.
   6    Birbhum Feeder Segregation LOI Issued M/S L&T Ltd Work stated in 43 no. Feeders. May 2019
Metering 47000 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 837 km renovation of LT line by AB Cable completed.
36 no New Distribution Transformer installed.
   7   Malda Feeder Segregation LOI issued M/S Bajaj Electricals Ltd. Work stated in 24 no. Feeders. January 2019
Metering 73989 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 448 km renovation of LT line by AB Cable completed.
174 no New Distribution Transformer installed.
   8    Murshidabad Feeder Segregation LOA issued M/S SPML Ltd. Work stated in 38 no. Feeders. 14 no feeders commissioned. January 2019
Metering LOA issued M/S L&T Ltd. 79726 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 824 km renovation of LT line by AB Cable completed.
70 no New Distribution Transformer installed.
   9    Nadia Feeder Segregation LOA issued M/S L&T Ltd. Work stated in 28 no. Feeders. 2 no feeders commissioned. January 2019
Metering 116160 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 863 km renovation of LT line by AB Cable completed.
195 no New Distribution Transformer installed.
   10    Paschim Midnapur Feeder Segregation LOI Issued M/S ILFS ECC Ltd. Work stated in 56 no. Feeder.9 no feeders commissioned. January 2019
Metering LOA issued M/S L&T Ltd. 87892 no. defective consumer meters replaced. May 2019
Village Infrastructure for access to power for all Rural HH. 718 km renovation of LT line by AB Cable completed.
91 no New Distribution Transformer installed.
   11    Purba Midnapur Feeder Segregation LOA issued M/S L&T Ltd. Work stated in 4 no. Feeder. January 2019
Metering 114526 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 974 km renovation of LT line by AB Cable completed.
250 no New Distribution Transformer installed.
   12    Bankura Feeder Segregation LOA Issued M/S EMC Ltd LOA placed with the agency terminated due to non performance. Fresh tendr under process.
Metering
Village Infrastructure for access to power for all Rural HH.
   13    Purulia Metering LOA Issued M/S EMC Ltd LOA placed with the agency terminated due to non performance. Fresh tender under process.
Village Infrastructure for access to power for all Rural HH.
   14    Darjeeling Feeder Segregation Departmental Execution Worked Started December 2019
Metering Departmental Execution
Village Infrastructure for access to power for all Rural HH. Departmental Execution
   15    Jaipaiguri(including Alipurduar) Feeder Segregation LOA issued M/S L&T Ltd. Work stated in 6 no. Feeders. January 2019
Metering 51725 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 549 km renovation of LT line by AB Cable completed.
137 no New Distribution Transformer installed.
   16   Coochbehar Feeder Segregation LOA issued M/S L&T Ltd Work stated in 4 no. Feeder. 1 no. Feeders commissioned. January 2019
Metering 40835 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 352 km renovation of LT line to AB Cable completed.
134 no New Distribution Transformer have been installed.
Electrification of Habitations less than 100 HH. M/S BISPA India Ltd Work Completed.
   17   Uttar Dinajpur Feeder Segregation LOA issued M/S L&T Ltd. Work stated in 8 no. Feeders. January 2019
Metering 64480 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 492 km renovation of LT line by AB Cable completed.
132 no New Distribution Transformer installed.
   18   Dakhin Dinajpur Feeder Segregation LOA issued M/S L&T Ltd. Work stated in 11 no. Feeder.2 no feeders commissioned. January 2019
Metering 65663 no. defective consumer meters replaced.
Village Infrastructure for access to power for all Rural HH. 621 km renovation of LT line by AB Cable completed.
41 no New Distribution Transformer installed.
B . Status of New 33/11 KV Substation Under System Strengthening in DDUGJY Scheme as on 30.09.2018

SL NO: District                                   Departmental                                   Turnkey Execution
Number Status of work Target for completion Number Status of Work Name of Turnkey agency Target for completion
(New Substations)
1 North 24 parganas 3 Works are under progress i)December,2018: 2 No
-
ii) June,2019:1 No
2 South 24 parganas and Biddhannagar 4 All Sub-Stations commissioned. -
3 Howrah 4 3 No substations comissioned November, 2018
1 No Work is under progress.
4 Burdwan 10 3 No substations commissioned. i) October,2018: 2 No
7 No work is under progress ii)December, 2018:4 No
iii) June,2019:1 No
5 Hooghly 3 1 No Substation Comissioned. December,2018 :2 No
2 No Works are under progress
6 Birbhum 3 1 No Substation Comissioned. December, 2018: 2 No 2 1 No Substation Commissioned. M/S Bajaj Electricals Ltd November 2018
2 No Works are under progress 1 No Works are under progress. November 2018
7 Malda 5 Works are under progress i) Msrch, 2019:4 No 3 2 No Substation Commissioned. M/S Bajaj Electricals Ltd
2 No Works are under progress 1 No Works are under progress. January 2019
8 Murshidabad 4 Works are under progress i) November 2018:2 No
ii) December, 2018:1 No
iii) March, 2019: 1No
9 Nadia 4 2 No Substation Comissioned. i)June, 2019:2 no.
2 No Works are under progress
10 Purulia 1 Works are under progress i) March,2019:1 No
11 Paschim Midnapur 6 2 No Substation Comissioned. December,2018: 3 No
4 No Works are under progress ii) June, 2019: 1 No
12 Purba Midnapur 4 2 No Substation Comissioned. i)December, 2018 : 2 No
2 No Works are under progress
13 Bankura 0 - - 3 Work under progress. M/S Bajaj Electricals Ltd November, 2018
14 Darjeeling 2 Works are under progress December,2018:2 No 2 All Substations Commissioned M/S Bajaj Electricals Ltd
15 Jaipaiguri (including Alipurduar) 1 Commissioned 4 Work under progress M/S Bajaj Electricals Ltd November 2018 - 2 No, Dec' 18 - 2 No
Work under progress. M/S T&T Ltd Dec '18 - 1 No
16 Coochbehar 5 2 No Substation Comissioned. i)December, 2018: 1 No
3 No Works are under progress ii) March, 2019: 1No
iii) June, 2019 : 1 No
17 Uttar Dinajpur 4 Works are under progress i) December, 2018:3 No
ii) March, 2019 : 1 No
18 Dakhin Dinajpur 1 Works are under progress ii) June, 2019 : 1 No No 2 Work under progresson M/S T&T Ltd December 2018
C . Status of Augmentation of Existing 33/11 KV Substation in DDUGJY Scheme As on 30.09.2018.

SL NO:                                  Name of the District                                  Departmental Execution
Scope of PTR Augmented (No) Status of work Target for completion
1 North 24 parganas 6 Commissioned
2 South 24 parganas and Biddhannagar 4 Commissioned
3 Howrah 7 Commissioned
4 Burdwan 2 Commissioned
5 Hooghly 2 Commissioned
6 Birbhum 6 Commissioned
7 Malda 5 Commissioned
8 Murshidabad 11 Commissioned
9 Nadia 8 7 No substation completed.
1 No Work under Progress November 2018
10 Purulia 0
-
11 Paschim Midnapur 6 Commissioned
12 Purba Midnapur 7 Commissioned
13 Bankura 10 Commissioned
14 Darjeeling 7 4 No substation completed.
3 No work under Progress November 2018
15 Jaipaiguri
(including Alipurduar)
5 Commissioned
16 Coochbehar 6 Commissioned
17 Uttar Dinajpur 5 Commissioned
18 Dakhin Dinajpur 3 Commissioned